FRANKLIN QUEST FIELD BASEBALL STADIUM
SALT LAKE CITY, UTAH
This fast-track project involved a three-tiered, 13,000 seat stadium with built-in luxury box seating on the
second tier. The main support for the structure consists of reinforced concrete with subsequent levels
utilizing structural steel. Inspections by CEL included reinforced concrete, structural steel and masonry (used for the stadium's fascia).
CEL's scope of services also included precast concrete, post tensioned concrete, shotcrete, shop and field welding, anchor dowel installation and
epoxy injection testing and inspection.
Client:
Salt Lake City Corporation
℅ Sahara Construction
Tom Maybe – (801) 298-7724
Architect:
VCBO
Brent Tippets – (801) 575-8800
Structural Engineer:
Martin & Martin
Steve Judd – (801) 975-0909
Duration:
1993 – 1994
Construction Costs:
$22 Million
CEL Fees:
$220 Thousand