click to open the Adobe Acrobat file

FOUR SEASONS HOTEL
SAN FRANCISCO, CALIFORNIA

After Consolidated Engineering Laboratories (CEL) successfully completed the Sony IMAX project, CEL and the owner negotiated the contract to provide materials testing and inspection on the new 38-story Four Seasons Hotel site adjacent to the Marriott. CEL's scope of services was a complete materials testing and inspection scope, from the shoring and underpinning all the way to the topping off of the structural steel. The building is composed of 14,000 tons of structural steel which was fabricated over an 11-month period at PDM's Stockton facility. CEL performed 100% ultrasonic testing of full multipenetration welds and 50% magnetic particle testing of fillet welds. In addition, CEL performed inspections on all six mat foundation pours and all concrete throughout this structure. CEL was accepted for this project because of their ability to react to a highly pressurized construction schedule and act as an aid to help the contractor achieve his schedule.
Client:
Millennium Partners
Mark Farrar – (415) 537-3890
Architect:
Gary Handel & Associates
Glenn Rescalvo – (415) 495-3828
Structural Engineer:
DeSimone Consulting Engineers
Ted Canon – (415) 398-5740
General Contractor:
Hathaway Dinwiddie Construction
Ed Conlon – (415) 986-2718
Duration:
May 1999 – April 2002
Construction Costs :
$215 Million
CEL Fees:
$1.2 Million