288 3RD STREET
OAKLAND, CALIFORNIA
A collection of contemporary condominiums and flats, this project involves construction of a seven-story building. The lower two levels consist of a reinforced concrete, podium-style parking garage, and the upper five stories to be light-steel frame construction. Consolidated Engineering Laboratories’ scope of
services include reinforced concrete, post-tensioned concrete, shotcrete, and structural steel testing and
inspection. CEL is working closely with Signature Properties to ensure inspection continuity over the
course of the project.
Client:
Signature Properties
Gus Ferriols – (925) 468-3113
Architect:
Levy Design Partners
Toby Levy – (415) 777-0561
Structural Engineer:
Nishikian-Menninger
Kevin Menninger – (415) 541-9477
General Contractor:
Signature Properties
Joe Freitas – (925) 580-8593
Duration:
April 2005 – June 2006
Construction Costs :
$8 Million
CEL Fees:
$62 Thousand