click to open the Adobe Acrobat file

PLEASANT HILL PARKING STRUCTURE
PLEASANT HILL, CALIFORNIA

Consolidated Engineering Laboratories (CEL) provided all of the materials testing and special inspection services for this four level post tensioned concrete structure that was designed in conjunction with the downtown Pleasant Hill Redevelopment Project providing much needed parking for the retail shops and restaurants. CEL's scope of services included inspection and testing of concrete, prestressed concrete, masonry, shop and field welding, anchor dowel, and fireproofing.
Client:
Burnham Pacific
Harry Stark – (925) 938-9683
Architect:
Watry Design Group
Genaro Morales – (650) 298-8150
Structural Engineer:
KPFF Consulting Engineers
Marc Press – (415) 989-1004
General Contractor:
Overaa Construction
Kolby Powell – (510) 234-0926
Duration:
February 1999 – December 1999
Construction Costs:
$6 Million
CEL Fees:
$67 Thousand