BRITANNIA EAST GRAND PHASE I
SOUTH SAN FRANCISCO, CALIFORNIA
Consolidated Engineering Laboratories was retained by Project Management Associates to
provide quality control inspection services for this fast-paced, complex construction project. The first
phase consisted of four structural steel office buildings comprising nearly 500,000 square feet of office
space. The structural steel fabrication was performed at Gayle Manufacturing
facilities in both Woodland, California and Nampa, Idaho using a multiple shift operation. Parking
structure A, which is a seven-level parking garage with over 1,200 parking stalls, was a complex posttensioned
configuration and required extensive coordination with the structural engineer of record.
Client:
Project Management Advisors
Bruce Heimbach – (858) 453-3394
Architect:
DES Architects & Engineers – (650) 364-6453
Structural Engineer:
John Yadegar & Associates
John Yadegar – (415) 243-0858
General Contractor:
Hathaway Dinwiddie Construction
John Littlefield – (408) 242-7081
Duration:
September 2004 – December 2005
Construction Costs :
$120 Million
CEL Fees:
$487 Thousand