560 MISSION
SAN FRANCISCO, CALIFORNIA
CEL and Consolidated Consulting Engineering successfully completed this project in May of 2002. This
project consisted of a 30-story multi-use structural steel building with three floors of subterranean
parking. We provided all of the required materials testing and special inspection for this project,
including reinforced concrete, shotcrete, masonry, architectural pre-cast concrete, structural steel,
fireproofing, curtainwall installation and floor flatness. The Consulting Engineering Division provided in-situ air and water infiltration testing.
Client:
Hines
Chris Collins – (415) 982-6200
Architect/Structural Engineer:
Skidmore Owings Merrill
Steve Sobel – (415) 981-1555
General Contractor:
Turner Construction
Dennis Newman – (415) 274-2913
Duration:
October 2000 – May 2002
Construction Costs :
$200 Million
CEL Fees:
$340 Thousand