This project consisted of a new 150,000 s.f., 8-story structural steel critical care building and
160,000 square foot, 7-story post-tensioned parking structure. Consolidated Engineering Laboratories
performed all construction inspection and materials testing services for this project. The scope of service
included soils excavation, observation and gradation, field welding, concrete placement and posttensioned
concrete, fireproofing, proofload testing and batch plant. The structural steel was fabricated at
W & W Steel Fabrication facility in Oklahoma City, Oklahoma.
Client:
County of Alameda ℅ O’Brien-Kreitzberg
Eric Hoffknecht – (510) 208-9586
Robert Hubner – (510) 535-7506
Architect:
RBB Architects
Peter Djabiras – (310) 473-3555
Structural Engineer :
Middlebrook & Louie
Hardip Pannu – (415) 546-4900
General Contractor :
Mortenson Construction – (763) 522-2100
Duration:
1999 – 2003
Construction Costs :
$150 Million
CEL Fees:
$1.1 Million