CEL performed all of the ultrasonic testing of the complete and partial penetration welds (both shop and field) on this new 6-story structural steel frame building which was fabricated over a 6-month period at
Gayle Manufacturing's Woodland, California facility. In addition, CEL performed inspections on the mat
foundation pour and all concrete throughout this structure. Inspections also included masonry and
fireproofing.
CEL served two clients on this project: the inspection services for the structural steel, both shop
fabrication and field services were contracted by Gayle Manufacturing, and all other field services were
contracted by the University of California, Davis.
Client:
University of California, Davis
Joel Swift – (530) 752-1956
Gayle Manufacturing
Phil Suek – (530) 662-0284
Architect:
Smith Group, Inc. – (415) 227-0100
Structural Engineer:
Ove Arup & Partners
Catherine Leggitt – (415) 946-0217
General Contractor:
Gilbane Construction
Dave Yung – (408)660-4420
Duration:
2001 - 2003
Construction Costs:
$95 Million
CEL Fees:
$155 Thousand