| REINFORCED CONCRETE |  | - Mix Design Review
- Sample, Tag and Test Reinforcing Steel
- Batch Plant Inspection and Batch Plant Audit
- Reinforcing Steel Placement Inspection
- Concrete Placement and Sampling
- Concrete Compression Testing
- Drying Shrinkage
- Floor Flatness / Floor Levelness (FF/FL)
- In-situ Temperature & Strength by the Maturity Method
|
| | | | POST-TENSIONED CONCRETE |  | - Laboratory Testing of PT Tendons
- Reinforcing Steel and Tendon Placement Inspection
- Concrete Placement and Sampling
- PT Tendon Stressing Inspection
- Concrete Compression Testing
|
| | | | PRECAST CONCRETE FABRICATION |  | - Reinforcing Steel and Tendon Placement Inspection
- Pre-Stressing Inspection
- Concrete Placement and Sampling
- Concrete Compression testing
|
| | | | SHOTCRETE AND PRE-PRODUCTION TEST PANEL |  | - Mix Design Review
- Reinforcing Steel Placement Inspection
- Shotcrete Placement and Sampling
- Shotcrete Core Compression Testing
- Shotcrete Pre-Production Test Panel (Nozzleman Qualification)
|
| | | | MASONRY AND VENEER INSPECTION |  | - Mix Design Review
- Reinforcing Steel Placement Inspection
- Concrete Masonry Unit and Veneer Placement Observation
- Mortar, Grout and Prism Compression Testing
- Compression, Linear Shrinkage, Moisture and Absorption per ASTM C140
|
| | | | MISCELLANEOUS AND STRUCTURAL STEEL WELDING |  | - Review of Welding Procedure Specifications
- Material Identification
- Shop Fabrication Welding Inspections
- Field Welding Inspections
- Metal Deck and Shear Stud Inspections
- Reinforcing Steel Welding
- Nondestructive Testing (Magnetic Particle and Ultrasonic Testing, Dye Penetrant)
- High Strength Bolting Inspection and Torque Testing
- Laboratory Testing of High Strength Bolt Assemblies
|
| | | | SPRAY APPLIED AND INTUMESCENT FIREPROOFING |  | - Verify Substrate Preparation
- Verify Thickness
- Perform Density Testing of Fireproofing
- Adhesion and Cohesion Testing
|
| | | | ROOFING |  | - Review Roofing Submittals
- Provide Field Inspections for Built-up Roofing
- Unit Weight Analysis of Cutouts
|
| | | | WATERPROOFING AND CAULKING SEALANTS |  | - Determine Proper Material Usage and Storage
- Inspect Substrate Conditions
- Horizontal and Vertical Membrane Compliance
- Observe Repairs
- Monitor Attachment of Waterproofing to Substrate
|
| | | | SPECIALIZED SERVICES |  | - Floor moisture
- Load Testing
- Metallurgical Consultation
|
| | | | GEOTECHNICAL AND ENVIRONMENTAL SERVICES |  | - Geotechnical Site Investigations
- Geologic Hazard Reports
- Fault Investigation Studies
- Hydrogeology Investigation
- Slope Stability and Landslide Analysis
- Phase 1 and Phase 2 Environmental Site Assessments
- Storm Water Pollution Prevention Plans (SWPPP)
- Construction Observation and Testing
|
| | | | ANCHORS AND DOWELS |  | - Installation Inspection
- Torque Test
- Proofload Test
|
|
|  |
| GROUND PENETRATING RADAR (GPR) SYSTEM |  | - Inspect floors, walls, decks, slabs, tunnels, balconies, garages;
- Locate rebar, tension cables, conduits, voids, PVC pipes and measure slab thickness;
- Thousands of square feet of concrete can be inspected in a day;
- Locate targets up to 36 inches in concrete;
- Detect and map the relative concrete condition for rehab planning;
- Quickly, easily and safely locate embedments within concrete structures prior to drilling, cutting or coring;
- Only single-sided access needed.
|
| | | | SMOKE CONTROL TESTING |  | - Test all Smoke Detectors, Duct Detectors, Pull Stations, Sprinkler Flow Switches and Tamper Switches
- Verify Stair Pressurization Points, Dampers, Air Handling Functions, Elevator Recall, Addressable Devices, Door Pulls, Strobes, Speakers, Circuit Voltage Drop, Pressurization between Floors and Emergency Generator Cut-In
|
| | |
| QUALITY CONTROL MANAGER |  | - The Quality Control Manager will oversee and direct the implementation of a Quality Control Plan consistent with the contract documents and in accordance with section 1400 of the project specifications
- Develop a quality control program
- Manage and implementation of the quality control program
- Attend all coordination meetings
- Manage and coordinate the three phases of control documentation
|
| | |
| QUALITY CONTROL SPECIALIST |  | - Will report to the Quality Control Manager and provide on-site services as required by the project specifications
|
| | | | WOOD FRAMING INSPECTION |  | - Observe Materials and Installation Operations
- Inspect Bolts in Concrete, Size and Grade of Lumber, Nailing Patterns, Size and Type of Nails
|
| | | | ELECTRICAL INSPECTION |  | - Determine Materials Comply with Product Listings
- Check Conduit sizes, types and runs
- Check Breakers and Witness Megger Test
- Determine that wiring is installed per Section 300 of the N.E.C. and Grounding per Section 250 of the N.E.C.
|
| | | | PLUMBING INSPECTION |  | - Check DWV and water piping for type, size and bracing
- Check access compliance
- Check pipe bedding
- Witness system tests
|
| | | | NON-DESTRUCTIVE TESTING |  | - Visual
- Dye Penetrant
- Magnetic Particle
- Radiography
- Ultrasonic
- Pachometer
- Schmidt Hammer
- Windsor Probe
|
| | | | SOILS AND ASPHALT |  | - Perform a site reconnaissance, review the geotechnical engineer report prepared for the project, review the drawings, and prepare a transfer of geotechnical engineer of record responsibility letter
- Project management, consultation during construction, preparation of daily field, foundation excavation observation, and final grading reports
- Observation and testing during site clearing and mass grading
- Observing the foundations excavations for structures
- Observation and testing during backfilling of utility trenches
- Observation and testing during backfilling around retaining walls
- Observation and testing during subgrade preparation and baserock placement in asphalt paved areas
- Observation and testing during asphalt concrete placement
|
| | |
|